| Architect: | RIM Architecture |
| General Contractor: | Davis Constructors Inc. |
| Facade Design & Supply: | Overgaard Ltd. |
| Installation: | Bucher Glass Inc. |
7,200m² of unitised curtain wall.
Low-e insulated glass.
4 sided structurally glazed system including aluminium panels.
Double floor height units to improve installation efficiency.
Fully installed within 4 – 5 weeks.
Date of Completion: June 2009.